If Your ERP Can't Run Your Projects, It's Time to Change It

Larson Chigbu

Larson Chigbu

· 6 min read

If your ERP cannot handle project costing, budgeting, subcontracting, quotations and resources in one place, it cannot tell you whether a project is making money. That alone is reason enough to change it.

Many project-based businesses live with a quiet compromise. The ERP handles the accounts and maybe the purchases, while the budget sits in Excel, subcontractor payments are tracked in a notebook, quotations are typed in Word, and staff hours are never recorded at all.

Each piece looks manageable on its own. Together, they hide the one number every project owner needs: the true profit or loss of each project, today.

Half in the ERP, half on paper, means no true picture

A project's profit is simple arithmetic: what the client pays, minus everything the project consumes. The problem is that "everything" is spread across materials, labour, equipment, subcontractors and overheads, and each of those lives in a different place when the ERP only does part of the job.

When some costs are in the system and some are kept manually, three things go wrong:

• Costs go missing. A subcontractor invoice paid from petty cash, or materials moved from another site, never reaches the project's cost report.• Numbers arrive late. Spreadsheets are updated at the end of the week or the month, so by the time you see a problem, the money is already spent.• Nobody trusts the report. When the ERP figure and the spreadsheet figure disagree, managers argue about whose number is right instead of fixing the project.

The result is that many businesses only discover a project lost money after it is finished, when it is too late to do anything about it.

Five things your ERP must handle on every project

Table


If your current system can only do two or three of these, you are still running the rest of the project by hand, and the gaps are exactly where profit disappears.

See your profit from day one, not at the end

When the whole project lives in one system, profit stops being a surprise. You see it at three points:

1. Before you start. The accepted quotation becomes the project budget, so your expected profit is visible on day one.2. While the project runs. Every purchase, material issue, subcontractor payment and hour worked is charged to the project as it happens. You can see, this week, whether you are still on track for that profit or drifting into a loss.3. When you finish. The final report shows quoted versus actual for every cost line, so the next quotation is priced on facts, not memory.

Take a simple example. A contractor quotes ₦50 million for a fit-out job, with a budget of ₦40 million and an expected profit of ₦10 million. Halfway through, the ERP shows ₦26 million already spent on 50% of the work. That is a warning sign while there is still time to act: renegotiate a variation, tighten material use or re-plan labour. With costs split across spreadsheets, the same overrun would only be discovered at the end.

Signs it's time to change your ERP

• You find out whether a project made money only after it closes.• Project budgets are kept in spreadsheets outside the ERP.• Quotations are written in Word or Excel and re-typed into the system.• Subcontractor agreements and payments are tracked on paper or in a separate file.• Staff hours and equipment use are not charged to projects.• Your project manager and your accountant report different numbers for the same project.

If two or more of these sound familiar, the problem is not your team. It is a system that was never built to run projects end to end.

How Winlium runs the whole project

Winlium ERP manages every aspect of a project in one system: quotations, budgeting, project costing, subcontracting, resources and the time your people spend on each job.

Because it is a full ERP, the Project module works with Purchase, Requisition, Inventory, Expenses, HRM and Accounting. A material request on site, a subcontractor payment and a timesheet all land on the same project, in the same system, as they happen. Built-in dashboards then show quoted, budgeted and actual figures side by side, so you can see expected profit at the start and real profit or loss at any point along the way.

A project that is half in the ERP and half on paper will always give you half the truth. Put the whole project in one place, and you will know whether you are making money before it is too late to change the outcome.

Winlium ERP is built for Nigerian businesses and ready for the world. To see how it handles your projects, visitwww.winlium.com or email info@winlium.com.

See WINLIUM running on your workflows

Book a personalised walkthrough and we'll show you the modules that matter to your business.

Book a demo

Related articles